Started sanitary sewer service replacements to
residents on the north side of the street. Removed connection to existing
8-inch sanitary sewer in the middle of the street and reconnected to the
existing 12-inch sanitary sewer on the south side of the street.
·
Started removal of the existing 8-inch sanitary
sewer in the middle of the street.
Work Anticipated to be performed next week, June 12th
to June 16th
·
Complete sanitary sewer replacements
·
Complete removal of existing sanitary sewer in the
middle of the roadway
·
Begin water main installation